
Identify the drawing that controls the project
Green Oaks’ currently linked site-development guidance, dated 2021, rejects hand-modified existing surveys and describes approved signed plans. An informal mark showing a desired toilet position is not a replacement for that project documentation.
Ask the project lead which current drawing applies. If the proposed equipment changes something shown on it, refer the question to the responsible design and municipal reviewers instead of treating the rental sketch as an approved amendment.
Supply dimensions as information, not approval
Ask the provider for the actual equipment footprint and service requirements. Pass those details to the project professional so the proposed location can be considered with the rest of the site.
Label any working sketch clearly. A supplier’s discussion of whether it can reach a cabin does not certify the land-development design, and a drawn rectangle does not reserve the equipment.
Give delivery one settled instruction
After the responsible parties resolve the placement, provide the agreed position and entrance to the rental provider. Remove superseded working notes from the delivery instructions to avoid conflicting directions.
Request a Green Oaks proposal for the actual work period and users. Confirm current municipal requirements; this guide does not determine whether a specific plan revision is required.
Questions before you book
Can I mark a new toilet position on an old survey and treat it as approved?
Use the current project-review process. A rental-location note is not automatically an accepted change to a professional site plan.